参考APIC "how to do" DOCUMENT 11.50 Stability monitoring of APIs
Batches should be included in the stability testing program within one month after its manufacturing date. For batches that are placed under stability later than one month after its manufacturing date an additional time point should be added to the stability protocol that corresponds to the retest/expiry date of the product.